Fly ash sampler sampling

time:2023-11-25 22:42:41Views:

1. Determination of Sampling


The sampling of fly ash sampler is selected on the flue between the outlet of the air preheater and the inlet of the dust collector. The specific installation location should generally meet the following conditions:


The flue gas temperature is less than 370 ℃;


At the straight pipe outer wall of the horizontal flue, and at a height of 1/3 of the flue from the bottom of the flue; Or at the straight pipe side wall of the vertical flue, and at a distance of 1/3 of the flue thickness from the rear wall of the flue;


There are no obstacles in the flue that affect positive sampling;


The representative parts of smoke flow velocity and dust particles;


There is a space outside the flue for the installation of measuring devices and normal operation.


2. Opening of sampling holes


According to the determined sampling location, remove the insulation layer of the flue after shutdown, and cut a 142mm (width) X232mm (height) rectangular hole on the flue wall for welding the rectangular flange.


3. Welding of canopies, flanges, and brackets


Remove the insulation layer of the flue between the canopy and the installation bracket of the measurement unit according to Figure 5, and then weld the canopy, rectangular flange, measurement unit installation bracket, extended angle iron, support angle iron, and pressure regulating valve installation plate separately (the welding position of the extended angle iron and pressure regulating valve installation plate depends on the on-site situation). When welding, it is necessary to ensure that the distance from the bottom edge of the rain shelter to the rectangular flange is 130mm; 2. The installation surface of the rectangular flange is perpendicular to the ground; 3. The distance from the installation surface of the rectangular flange to the flue wall is 350mm; The distance between the installation bracket of the measuring unit and the rectangular flange is ensured by the welding auxiliary connecting plate.


 

1-241110194G02M.webp

1-241110194G02M.webp

1-241110194G02M.webp

If the sampling unit is not installed temporarily, the square holes on the rectangular flange should be covered with the flange cover provided by the manufacturer and tightened with screws to ensure the sealing of the flue during boiler operation.


4. Welding of on-site control cabinet installation bracket


The installation bracket of the control unit can be welded between two measuring units or on a steel column near a certain measuring unit according to the on-site conditions. During welding, the height from the edge of the installation bracket to the on-site walkway or platform surface should be about 1.8 meters.


5. Installation of sampling unit


6. Adjust the sampling tube


According to the different positions of the flue installed in the sampling unit, it is necessary to adjust the sampling tube to ensure that the direction of the intake nozzle of the sampling tube is aligned with the direction of the flue gas flow. Adjustment method: 1. Loosen the nut (1), 2. Loosen the long nut, 3. Pull out the sampling tube in an upward direction until the cylindrical pin on the circular flange of the sampling tube is detached from the installation plate. 4. Rotate the sampling tube according to the flow direction of the throat at the installation position, so that the intake nozzle of the sampling tube is facing the direction of the smoke flow. Then insert the cylindrical pin on the circular flange of the sampling tube into the corresponding positioning space on the installation plate. 5. Tighten the long nut, 6. Finally, tighten the nut (1).


7. Installation of measurement units


Installation method: 1. Place the measuring unit on the installation rack and place a spirit level (provided with the equipment) on the measuring unit section; 2. By adjusting the lifting of the four bolts and rods at the bottom of the measuring unit, combined with the stable horizontal movement of the measuring unit, the ash inlet of the measuring unit is concentric with the lower ash outlet of the sampling unit cyclone dust collector. At the same time, the transition pipe component can precisely connect the lower ash outlet of the sampling unit cyclone dust collector and the ash inlet of the measuring unit; 3. Fine tune the 4 rod bolts at the bottom of the measuring unit, while observing the level of the measuring unit, so that the surface of the measuring unit is in a horizontal state; 4. Tighten the nut of the transition pipe component between the measuring unit and the sampling unit cyclone dust collector; 5. Tighten the four parallel nuts of the rod bolts at the bottom of the measuring unit; 6. Tighten the four tie rod bolts at both ends of the bottom of the measuring unit and tighten the nuts; 7. After the installation of the measurement unit is completed, restore the insulation layer and protective iron sheet on the flue wall.


產(chǎn)品動(dòng)態(tài)

Fly ash sampler sampling源頭廠家Copyright ? 2012-2023 Lianyungang Lingdong Electromechanical Equipment Co., Ltd all rights reserved

Tel

0518-85370171

日韩电影无码一区二区三区| 66av在线| 裸体美女网站麻豆av| 亚洲 欧美 制服 中文字幕| av蜜臀中文| 天天色天天日天天射天天好逼综合| 天天干天天肏天天射| 亚洲 日韩 欧美 人妻| 日韩欧美天天色| 美艳人妻视频网| 亚洲最大av网站在线| 欧美COm视频三区| 亚洲综合久久中文字幕天天干天天色| 婷婷五月天 亚洲激情| 国产欧美老鸭窝| 大香蕉鸡巴在线网| 激情成人福利综合网| 天天干天天射综合| 视频在线一区二区三区| 免费看插b视频网站| 欧美系列日韩一区| 久久99精品久久久久久| 国产三级久久久久黄色电影| 日韩无码麻豆91国产一区二区| 小日本精品久久久久久| 日本中文字幕不卡一百区| 久久久久久久久久久久婷婷| 论坛| 久久久免费AV| 三级AV久久伊人| 二码一区二区| 曰本AⅤ久久中文字幕综合| 日韩 欧美 国产成人高| 91精品国产91久久综合麻豆| 麻豆视频在线播放| 国产有码无码自拍视频| 亚洲自拍偷拍自拍偷拍| 国产AN麻豆一区二区| 爱五月 深爱五月婷婷| 超碰少妇偷人| 亚洲AⅤ天堂网|